Flora and fauna protected, clearing done right, and approval conditions met from the first tree down.
Vegetation clearing is often the first thing that happens on a project. Clear the wrong area, miss a protected plant or disturb a nesting animal and the consequences range from a stop work order to prosecution, with a delay to the whole programme in between.
AES prepares vegetation management plans for construction and infrastructure projects that need to clear native vegetation. Our plans cover the flora and vegetation on your site as a whole: what can be cleared, how and when it can be cleared, what must be protected during clearing, and how the site will be rehabilitated afterwards.
Featured Project
Environmental & Landowner Advisor for Transmission Line Maintenance
Runcorn to Eight Mile Plains, Queensland
Applied Environment & Safety provided onsite environmental and landowner support for this tower maintenance project located within the southern suburbs of Brisbane.
This required managing project works adjacent to sensitive areas such as Bulimba Creek, major motorways and within residential backyards.
Environmental support for this project included development of Site Based Management Plans and operational checklists. Ongoing environmental monitoring and liaison with nearby residents was undertaken during the abrasive blasting and painting works. Then supervision of the clean-up of the work sites and rehabilitation for project closure.
What Is a Vegetation Management Plan?
A vegetation management plan, sometimes called a VMP or a flora management plan, sets out how a project will manage native vegetation. It defines the clearing footprint and the areas to be protected, the clearing methods and sequence, pre-clearing surveys, and rehabilitation or offset commitments that follow.
Vegetation clearing is regulated by all three levels of government: local, state and, for matters of national environmental significance, federal. A good plan translates those overlapping requirements and your specific approval conditions into clear instructions for the people doing the clearing.
Why Vegetation Management Matters
Clearing native vegetation without the right approvals, or outside the approved footprint, is one of the most serious and most frequently prosecuted environmental offences in Australia. Protected plants, threatened species habitat and regulated vegetation can all sit within an otherwise routine construction footprint.
Clearing is also time critical with many surveys being season dependent. A plan that anticipates those constraints keeps the programme moving. One that discovers them on the day does not.
Who Needs a Vegetation Management Plan?
A vegetation management plan is typically needed by:
- Projects with a vegetation or flora clearing condition attached to their approval
- Any infrastructure projects with native vegetation clearing
- Projects affecting habitat for threatened species or protected plants
- Sites requiring rehabilitation or revegetation after construction
Typical Applications
- Vegetation and flora and fauna management plans prepared to approval conditions
- Clearing protocols defining footprints, exclusion zones, sequencing and methods
- Protected plant and threatened species management measures
- Rehabilitation and revegetation plans for disturbed areas
What We Include
Every AES vegetation management plan includes:
- Review of your approval conditions and local, state and federal vegetation requirements that apply
- Mapping of the clearing footprint, retained vegetation and exclusion zones
- Rehabilitation, revegetation and offset commitments where they apply
- Inspection, reporting and record keeping requirements
Industries We Support
Applied Environment & Safety provides vegetation management planning for organisations and complex projects across a range of industries.
Power & Renewables
With vast experience within the power & renewables industry, we understand the risks and opportunities.
Mining & Resources
We provide environmental and safety consulting support to exploration and production operations within the mining and resources industry.
Transport & Civil Works
Our experience in environmental and safety management provides practical support to our clients within the transport & civil works.
Why Work With Applied Environment & Safety
We write for the people doing the clearing. Footprints, exclusion zones and the order of work are set out clearly enough for an operator and a spotter catcher to follow on the day, because that is where vegetation compliance is won or lost.
We plan clearing around the programme. Survey timing, breeding seasons and spotter catcher availability are built into the plan from the start, so clearing happens when the project needs it to rather than being held up by a constraint nobody saw coming.
AES has vast experience in the development of vegetation management plans for major infrastructure projects across Australia. We have developed plans as part of the overarching Construction Environmental Management Plan or separate Vegetation Management Plans to align to project approvals.
Clear the Right Way, First Time
Request a proposal for a Vegetation Management Plan and we will scope it against your clearing footprint, approval conditions and programme.
Contact our team today to discuss your project requirements.
Other Environmental Management Services
Environmental Auditing and Compliance Audits
Learn more
Erosion and Sediment Control Plans (ESCP)
Learn more
Environmental Management Plans (EMP)
Learn more
Construction Environmental Management Plans (CEMP)
Learn more
Environmental Compliance and Monitoring
Learn more
Acid Sulfate Soil Management Plans
Learn more
Dust Management Plans
Learn more
Environmental Risk Management
Learn more
Resources & Insights
-
Corporate Climate Change & Decarbonisation Planning
Turning climate commitments into practical action requires more than setting emissions targets. Organisations need a clear understanding of their emissions profile, realistic reduction opportunities and a plan for putting those opportunities into practice. Applied Environment & Safety recently supported a major infrastructure and utilities business in developing its 2027–2032 Climate Change and Decarbonisation Plan, building…
-
Environmental Tender Support for a Major Transmission Project
Applied Environment & Safety supported a design and construct contractor through the tender phase of a major transmission infrastructure project in the Hunter Valley, New South Wales.
-
What is the Rehabilitation Hierarchy? A Guide to Land Rehabilitation and Environmental Management
Rehabilitation is often viewed as the final stage of a project, something that occurs once construction or operations have ceased and equipment has been removed. In reality, effective rehabilitation begins long before the first disturbance occurs. The most successful rehabilitation programs are guided by a rehabilitation hierarchy, a structured framework that prioritises avoiding impacts wherever…
FAQ’s
Common questions from project teams about vegetation clearing and management.
In practice they can cover the same information. A vegetation management plan tends to focus on clearing and retaining vegetation, while a flora and fauna management plan also covers fauna and fauna habitat.
Usually, yes. In Queensland, clearing may be regulated under the Vegetation Management Act 1999 and the protected plants provisions of the Nature Conservation Act 1992. In New South Wales, clearing is regulated under the Biodiversity Conservation Act 2016 framework and planning approvals. Where Matters of National Environmental Significance are affected, the federal EPBC Act can also apply.
Clearing outside an approved footprint can be a serious offence, with penalties, stop work orders and restoration requirements. Clearly marked footprints and exclusion zones, pre start briefings and supervision during clearing are the most effective ways to prevent it.